Water Main Installation Guide
Water main installation costs per foot range from 50 to 150.
Water main installation guide. How much does it cost to install a water main. Water main installation instructions these are the specifications for installation of water main services and hydrants and all appurtenances thereof for maine water company. Water main installation cost. And private water services type and size of meter to use who supplies and installs the meter meter installation details pipe and fitting installation backflow prevention assemblies fire hydrant permits and reusing of water service lines.
Where you live will actually help to determine the new water line cost. Water main installation air and vacuum release the design of a water distribution system must recognize the importance of alleviating air from the system and breaking a vacuum should it form. And backfilling the trench disinfecting the piping and testing the system before it is put in to use. Details of excavation and water main installation in the excavation.
Section 1 description of work. Water main installation training. D 3 fire hydrant installation detail for vaulted sidewalks d 5 fire hydrant drain detail d 6 fire hydrant sump for relocated hydrants d 7 color code for fire hydrants d 8 water main trench details d 9 water main trench insulation detail. These conditions typically form when a water main is being filled or drained for planned maintenance or during emergencies.
1 1 the work to be done consists of trenching laying water main services hydrants and. It might lower the. Where surface loads will be encountered and where frost is not a problem. Pvc pipe is one of the most affordable.
But besides distance other factors that we mention below all drastically affect your new water main cost. Nonetheless most water main projects range between 1 700 and 3 000. Water main installation is intended to follow the course on distribution system materials and equipment by continuing with information on water distribution system design and layout. Bedding cover backfill the bottom of the trench shall be undercut to provide a minimum of 4 inches of bedding material between the natural soil and the bottom outside barrel of the pipe to be installed.
Pvc pipe shall be installed according to awwa 605 underground installation of pvc pressure pipe and fittings for water main. The deeper the line needs to be dug then the higher the cost to install a water main will be. Existing water main existing water services existing telephone proposed sidewalk. Appendix a frequently asked questions contains a listing for.
Given the wide range it makes sense that water line installation costs vary.